PERIOD REPORT

DATE: January 16, 2017 Report No. EPW-17-003
TO: Laurie Hurst, Chief Administrative Officer
FROM: Jeff Miller, Director of Engineering and Public Works
SUBJECT:TITLE Engineering and Public Works Department - 2016 Third Period ReportBody

The following is a report on the activities pertaining to the Engineering and Public Works from September 1, 2016 to December 31, 2016.

I. DIVISION ACHIEVEMENTS AND ACTIVITIES

1. Sanitary Sewers
* 12 service lateral installed/replaced this period (total for the year = 24)
* Test and clear inspection as and when required
* 0 manholes replaced this period (total for the year = 0)

2. Pump Stations
* Crews have been carrying out routine maintenance activities.
* Annual maintenance program for pump maintenance and controls inspection carried out.
* Program also includes coordinating similar activities for View Royal pumps stations.

3. Storm Drains
* 7 service lateral installed/replaced this period (total for the year = 14
* Test and clear inspection as and when required
* 0 manhole replaced this period (total for the year = 0)

4. Manhole Separation
* The five year Manhole Separation Program has been completed.
* Remaining combination manholes will be separated on a case by case basis due to their location or complexity.
* A total of 78 manholes were separated over the five year program.
* Remaining combined manholes is 42
* 18 end of pipe
* 21 within easements on private property
* 3 not on easements on private property



5. Waste Management

Waste Water - inflow and Infiltration
* Staff is working on the development of the parameters of the approved strategy with a report being prepared in the first period of 2017.
* A request for proposal for modeling of the sanitary collection system is to be released and interpretation of smoke testing results to take place in the first period of 2017.

Liquid Waste Management Plan
* CRD and Project Board made final decision for the location for the waste water treat...