PERIOD REPORT
DATE: September 12, 2016 Report No. EPW-16-024
TO: Laurie Hurst, Chief Administrative Officer
FROM: Jeff Miller, Director of Engineering and Public Works
SUBJECT:TITLE Engineering and Public Works - 2016 Second Period ReportBody
The following is a report on the activities pertaining to the Engineering and Public Works from May 1, 2016 to August 31, 2016.
I. DIVISION ACHIEVEMENTS AND ACTIVITIES
1. Sanitary Sewers
* 3 service lateral installed/replaced this period (total for the year = 12)
* 0 test and clear inspection has been carried out for this period (total for the year = 0)
* 0 manholes replaced this period (total for the year = 0)
2. Pump Stations
* Crews have been carrying out routine maintenance activities.
* Annual maintenance program for pump maintenance and controls inspection awarded. Work to take place in the third period. Program also includes coordinating similar activities for View Royal pumps stations.
* The Township experienced a complete power failure to all pump stations. Crews maintained pump operations with use of portal generator. No overflows occurred.
3. Storm Drains
* 2 service lateral installed/replaced this period (total for the year = 7)
* 0 test and clear inspection has been carried out for this period (total for the year = 0)
* 0 manhole replaced this period (total for the year = 0)
4. Manhole Separation
* Funds allocated to 2015 Manhole Separation Program to be utilized on a case by case basis due to complexity of manhole separation. This work will be carried out in 2016 and beyond.
* A total of 78 manholes were separated over the five year program.
* Remaining combined manholes is 42
* 18 end of pipe
* 21 within easements on private property
* 3 not on easements on private property
5. Waste Management
Waste Water - inflow and Infiltration
* Staff is working on the development of the parameters of the approved strategy.
* In the third period, a request for proposal for modeling of the sanitary col...
Click here for full text