File #: 19-419    Version: 1 Name:
Type: Period Report Status: Agenda Ready
File created: 9/9/2019 In control: Special Committee of the Whole
On agenda: 9/16/2019 Final action:
Title: Engineering & Public Works Department - 2019 Second Period Report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
PERIOD REPORT

DATE: September 11, 2019 Report No. EPW-19-031
TO: Laurie Hurst, Chief Administrative Officer
FROM: Jeff Miller, Director of Engineering & Public Works
SUBJECT:TITLE Engineering & Public Works Department - 2019 Second Period Report
Body

The following is a report on the activities pertaining to the Engineering & Public Works Department from May 1, 2019 to August 31, 2019.

* DIVISION ACHIEVEMENTS AND ACTIVITIES

1. Sanitary Sewer
* 3 service lateral installed (new) this period (7 total for the year)
* 3 service laterals replaced (due to blockages) this period (13 total for the year)
* Tested and cleared inspections as required
* 0 manholes replaced this period (total for the year = 0)
* 0 new manholes installed this period (total for the year = 0)

2. Pump Stations
* Crews carried out routine maintenance activities
* Annual program for pump maintenance/controls inspections to be carried out in the third period
* Program also included coordinating similar activities for View Royal pump stations
* Scope of work for lockout locations on the various stations completed with tasks to be completed out in the third period

3. Storm Drains
* 3 new service laterals installed (7 total for the year)
* 1 service lateral replaced due to blockages (6 total for the year)
* 1 storm main drain replaced due to failure (1 total for the year)
* Test and clear inspections as required
* 0 manholes replaced (0 total for the year)
* 0 new manhole installed (1 total for the year)
* 0 catch basins replaced (0 total for the year)
* 0 new catch basin installed (0 total for the year)
* Program for catch basin cleaning completed with ongoing spot cleaning
* Discussions with DND and Coast Guard were initiated regarding spill response and some minor joint exercises completed
* Discussions with Public Works Canada will occur in the third period
* Staff will review Infrastructure Canada Grant Program for end of pipe treatment structures for Gorge Creek and West Bay collectio...