The livestream of the meeting can be viewed on most devices. If you are using Chrome and are unable to view the meeting, please use an alternate web browser such as Firefox or Microsoft Edge. Should you experience other technical difficulties, please review the troubleshooting guide for assistance. If the issue persists, please inform corporate.services@esquimalt.ca and we can relay the information to the webcast support company for assistance. Please note that staff technical support is not available outside of regular business hours or during meetings.

File #: 20-027    Version: 1 Name:
Type: Period Report Status: Agenda Ready
File created: 1/8/2020 In control: Special Committee of the Whole
On agenda: 1/13/2020 Final action:
Title: Engineering & Public Works Departments - 2019 Third Period Report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
PERIOD REPORT

DATE: January 8, 2020 Report No. EPW-20-001
TO: Laurie Hurst, Chief Administrative Officer
FROM: Jeff Miller, Director of Engineering & Public Works
SUBJECT:TITLE Engineering & Public Works Departments - 2019 Third Period Report
Body

The following is a report on the activities pertaining to the Engineering & Public Works Departments from September 1, 2019 to December 31, 2019.

1. DIVISION ACHIEVEMENTS AND ACTIVITIES

1. Sanitary Sewer
* 7 new service lateral installed this period (14 total for the year).
* 4 service laterals replaced (due to blockages) this period (17 total for the year).
* Test and clear inspections as and when required.
* 0 manholes replaced this period (0 total for the year).
* 0 new manholes installed this period (0 total for the year).

2. Pump Stations
* Crews carried out routine maintenance activities.
* Annual program for pump maintenance/controls inspections was carried out.
* Program also includes coordinating similar activities for View Royal pump stations.
* Design and installation of lockout mechanisms on the various stations was completed.

3. Storm Drains
* 9 new service laterals installed this period (16 total for the year).
* 0 service laterals replaced (due to blockages) this period (6 total for the year).
* 0 storm main drain replaced due to failure this period (1 total for the year).
* Test and clear inspections as and when required.
* 0 manholes replaced this period (0 total for the year).
* 0 new manholes installed this period (2 total for the year).
* 6 catch basins replaced this period (6 total for the year).
* 1 new catch basin installed this period (1 total for the year).
* Program for catch basin cleaning was completed.
* Discussions with DND and the Coast Guard were initiated with respect to spill response, with some minor joint exercises being completed.
* Training in spill response has been completed for half of Public Works staff in conjunction with some staff from the District of Saanich.
...