PERIOD REPORT
DATE:  	September 17, 2018	Report No. EPW-18-030
TO:  	Laurie Hurst, Chief Administrative Officer 		
FROM: 	Jeff Miller, Director of Engineering and Public Works 
SUBJECT:TITLE Engineering and Public Works - 2018 Second Period Report
Body
The following is a report on the activities pertaining to the Engineering and Public Works from May 1, 2018 to August 30, 2018.
I. DIVISION ACHIEVEMENTS AND ACTIVITIES
1.	Sanitary Sewer
   * 2 service laterals installed (new) this period (total for the year = 10).
* 7 service laterals replaced (due to blockages) this period (total for the year = 15).
* Test and clear inspections as and when required.
* 0 manholes replaced this period (total for the year = 0).
2.	Pump Stations
   * Crews have been carrying out routine maintenance activities.
* Annual program for pump maintenance/controls inspection to be completed in third period.
* Program also includes coordinating similar activities for View Royal pump stations.
* Scope of work for lockout locations on the various stations has been completed. Budget to be defined in third period.
3.	Storm Drains
   * 7 service lateral installed (new) this period (total for the year = 15).
   * 3 service laterals replaced (due to blockages) this period (total for the year = 9).
   * Test and clear inspections as and when required.
   * 1 manhole replaced this period (total for the year = 3).
* Program for catch basin cleaning was completed. Spot cleaning ongoing for the remainder of the year.
* Training program for spill response has been passed back to the Township form the CRD. Working with other stakeholders to develop a scope for the program.
* Completed grant application for end of pipe treatment structures for Gorge Creek and West Bay collection basins and submitted to Infrastructure Canada.
4.	Liquid Waste Management
	Waste Water - Inflow and Infiltration
* Working on finalizing a cost sharing strategy and bylaw for inflow and infiltration mitigation. Report will b...