PERIOD REPORT

DATE: September 17, 2018 Report No. EPW-18-030
TO: Laurie Hurst, Chief Administrative Officer
FROM: Jeff Miller, Director of Engineering and Public Works
SUBJECT:TITLE Engineering and Public Works - 2018 Second Period Report
Body

The following is a report on the activities pertaining to the Engineering and Public Works from May 1, 2018 to August 30, 2018.

I. DIVISION ACHIEVEMENTS AND ACTIVITIES

1. Sanitary Sewer
* 2 service laterals installed (new) this period (total for the year = 10).
* 7 service laterals replaced (due to blockages) this period (total for the year = 15).
* Test and clear inspections as and when required.
* 0 manholes replaced this period (total for the year = 0).

2. Pump Stations
* Crews have been carrying out routine maintenance activities.
* Annual program for pump maintenance/controls inspection to be completed in third period.
* Program also includes coordinating similar activities for View Royal pump stations.
* Scope of work for lockout locations on the various stations has been completed. Budget to be defined in third period.

3. Storm Drains
* 7 service lateral installed (new) this period (total for the year = 15).
* 3 service laterals replaced (due to blockages) this period (total for the year = 9).
* Test and clear inspections as and when required.
* 1 manhole replaced this period (total for the year = 3).
* Program for catch basin cleaning was completed. Spot cleaning ongoing for the remainder of the year.
* Training program for spill response has been passed back to the Township form the CRD. Working with other stakeholders to develop a scope for the program.
* Completed grant application for end of pipe treatment structures for Gorge Creek and West Bay collection basins and submitted to Infrastructure Canada.

4. Liquid Waste Management

Waste Water - Inflow and Infiltration
* Working on finalizing a cost sharing strategy and bylaw for inflow and infiltration mitigation. Report will b...