Legislation Details

File #: 26-150    Version: 1 Name:
Type: Staff Report Status: Agenda Ready
File created: 4/15/2026 In control: Advisory Planning Commission
On agenda: 4/21/2026 Final action:
Title: Review of the preliminary results of the Development Capacity Study: Draft Findings Report Version 1.1 April 2026 APC-26-012
Attachments: 1. Appendix A Esquimalt Development Capacity Study Draft Findings Report April 2026 Version 1.1 APC, 2. Appendix B Maps from the Development Capacity Study, 3. Appendix C Presentation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
REQUEST FOR DECISION
MEETING DATE: April 21, 2026 Report No. APC-26-012

TO: Advisory Planning Commission
FROM: Bill Brown, Director of Development Services
SUBJECT: Review of the preliminary results of the Development Capacity Study: Draft Findings Report Version 1.1 April 2026

RECOMMENDATION:

Recommendation
That the Advisory Planning Commission provide the Committee of the Whole with any comments related to the Esquimalt Development Capacity Study: Draft Findings Report Version 1.1 April 2026 attached as Appendix "A" to staff report APC-26-012.
Body

EXECUTIVE SUMMARY:

In order to provide Council, committees, residents, businesses, and staff with a clear understanding of the development capacity of the Township for future residential development, Licker Geospatial Consulting has been engaged to produce a report that summarizes a number of variables including land use, sanitary sewer, water, electricity, traffic, transit, recreation and parks, tree canopy, and emergency services that may constrain potential future residential development both temporarily and spatially. As a committee whose members represent the residents of Esquimalt, the preliminary findings are being presented to the Advisory Planning Commission for review and comment.


BACKGROUND:

The preliminary findings indicate that there are few constraints to potential future residential development. The most significant constraint identified so far is the capacity of the sanitary sewer system in certain areas. It should be noted that there are several areas where additional analysis needs to be completed such as:

- Obtaining the preliminary results of a new water modeling initiative by the City of Victoria.
- Fine tuning the financial model to account for unique attributes of the situation in Esquimalt.
- Incorporating results of the Recreation Strategic Plan
- Incorporating proposed housing numbers on CFB Esquimalt lands in Esquimalt.

None of this additional information is e...

Click here for full text